3rd Karnafuli Bridge at Chittagong

Type: Cable Stayed (First Cable Satyed Bridge in Bangladesh)
Length:950 metre
No.of Pillar: 5
Width: 24.47 metre
Lane: 4 lane with 1.5 m walkway and 1.5 m lane for manual transport.
Project Cost: 5.9 billion (590 crore in BDT)** ( 372 Crore is provided by Kuwait fund)
Approach Road: 0.5 Km in the city end & 1 km at Patia end.
Opening: September 8th, 2010

Short Description: The Karnaphuli third bridge on the River Karnaphuli connecting the Southern Chittagong, Cox's Bazar and the hill district Banderban is opened on 8 Sepetember 2010.
The construction of the bridge had started in July in 2006. The reputed Chinese Construction Company "Major Bridge Construction, China" had constructed the bridge.
Some 70 lakh inhabitants of the Southern part of Chittagong, Cox's Bazaar and Banderban districts will be benefited with the bridge.







3 comments:

  1. What is the distance between two pillar? I actually came here for this. Please mention this if posible.

    ReplyDelete
    Replies
    1. Span arrangement (2x16.00+ 4x22.00 +2x115.00 +3x200.00 ) m

      Delete